Life Cycle Assessment: Conceptual 30 Storey Tower
This Case Study explores the design of a conceptual 30-storey stone office block that would be cheaper and more sustainable than concrete or steel equivalents.
This Case Study explores the design of a conceptual 30-storey stone office block that would be cheaper and more sustainable than concrete or steel equivalents.
This Case Study explores the BREEAM International RFO of Calvin Klein in Köln Germany. It achieved an Excellent Certification.
This Case Study explores the Life Cycle Assessment and Life Cycle Costing of Hatfield’s Minster Close.
Eight Versa acted as the Sustainability Consultant for Tommy Hilfiger to secure a LEED Gold certification for a flagship store on Regent Street
Eight Versa was appointed to analyse daylight conditions at Camden Offices due to glare risk from direct light via skylights.
Eight Versa provided multi-disciplinary consultancy services for the project from an early stage, aligning the respective services to optimise the holistic sustainability performance of the development.
A review of how Eight Versa consulted on overheating, energy strategy, SuDS and BREEAM and the 15-21 Benwell Road project.
Shakespeare’s Globe is developing a new-build West Block and refurbishing its existing basement and backstage spaces.
The Wembley NW01 scheme is a new, phased residential development of 474 apartments over seven blocks, located in Wembley, London.
Eight Versa was commissioned to provide ecological evidence to satisfy a planning condition for the protection of bats at Brighton College.
Sign up to receive monthly updates where we’ll share a sustainability perspective grounded on reality